Published on Jan 15, 2018
BEFORE:
(PHOTO: OUR SINGAPORE)
A photo of the linkway that was not directly above the
traffic light crossing had gotten some people perplexed.
AFTER:
(PHOTO: THE STRAITS TIMES)
It turned out that the plan was for the shelter to be built first,
then the pedestrian crossing to be shifted under it.
MY TAKE: